NCWTS|Research|Completed
Timber Transportation Structures Research Needs Assessment: An Update
Long-Term Performance Evaluation of Timber Bridges
Development of a Smart Timber Bridge–Phase III: Moisture and Strain Sensor Investigation for Historic Covered Bridges
Integral Abutment Details for ABC Projects, Phase II
Cost-Competitive Timber Bridge Designs for Long-Term Performance
Buchanan County Smart Timber GRS Abutment Bridge
Nondestructive Evaluation of Wood
Development of a Smart Timber Bridge-Phase V: Development of a Vehicle Characterization
Strength, Durability, and Application of Grouted Couplers for Integral Abutments in Accelerated Bridge Construction
MnDOT LRRB Development of Cost-Effective Timber Bridge Repair Techniques for Minnesota
Field Evaluation of Methods to Minimize Transverse Glulam Deck Deflection Phase III
Field Testing and Evaluation of a Demonstration Timber Bridge
Director, BEC , Institute for Transportation
Co-Director, National Center for Wood Transportation Structures