NCWTS|Research|Completed
MnDOT LRRB Cost-EffectiveTimber Bridge Designs for Long-Term Performance
Development of a Smart Timber Bridge–Phase III: Moisture and Strain Sensor Investigation for Historic Covered Bridges
Integral Abutment Details for ABC Projects, Phase II
Cost-Competitive Timber Bridge Designs for Long-Term Performance
Strength, Durability, and Application of Grouted Couplers for Integral Abutments in Accelerated Bridge Construction
MnDOT LRRB Development of Cost-Effective Timber Bridge Repair Techniques for Minnesota
Field Evaluation of Methods to Minimize Transverse Glulam Deck Deflection Phase III
Field Testing and Evaluation of a Demonstration Timber Bridge